A comprehensive review of Xinhai Mining’s gold ore dressing projects in 2020!

2021-03-26 Source: Xinhai(1134views)

Welcome to consult Xinhai - customized mineral processing plan

Xinhai can provide you with mineral processing tests, mineral processing process and mineral processing equipment selection, mineral processing plant scheme design and construction drawing design; provide mining mineral processing equipment; provide mineral processing plant construction and equipment installation as well as mine management and operation services.

添加微信:15311826613

15311826613

Click to add WeChat
WeChat ID has been copied, add friends, and get manufacturer quotations!

In the extraordinary year of 2020, Xinhai Mining faced the difficulties, turned around against the wind, and became more courageous as it went on. The hard-working and brave Xinhai people still delivered a shining performance list in 2020. Next, let us take stock of some of the gold ore beneficiation projects completed by Xinhai Mining in 2020!

1. Guinea 15000TPD gold mineral processing project

Guinea Gold Mine Mineral Processing Project

Ore properties:The ore of this project is mainly oxide ore. 80% of the ore is powdery clay ore, containing granular gold. The average grade of the ore is 1.0g/t. There are very few impurities. Gold is the only recoverable element, and the ore is easy to select.

Xinhai Plan:Based on the test results, Xinhai Mining customized the heap leaching, desorption electrolysis process and gravity separation + cyanide process.

In 2018, the customer of this project entrusted Xinhai Mining to provide "Mining full industry chain services (EPC+M+O)" for its 4000tpd gold ore dressing plant. The design started at the beginning of 2018 and was completed and put into operation by the end of the year. The comprehensive recovery rate of the processing gold is about 90%. In 2019, the client of this project decided to expand the original 4,000tpd gold ore dressing plant, and expand the production capacity of the entire dressing plant to 6,000tpd on the original basis. Based on the successful production practice of the first phase, the project customer once again entrusted Xinhai Mining to provide one-stop, customized mining industry chain services (EPC+M+O) for its 6000tpd gold ore dressing plant project. Since the signing of the contract, Xinhai Mining only took 8 months (including 2 months for transportation and customs clearance) to officially put the gold mine project into production. The final comprehensive recovery rate reached 90%, and the economic benefits are considerable.
Since the 6,000tpd gold ore dressing plant project in Guinea was successfully put into operation, the mining company of this project quickly started the construction of the 15,000tpd gold mine project in 2019, continuing the chapter of cooperation with Xinhai Mining for the third time. At present, the Guinea 15,000tpd gold ore concentrator project has entered the final stage of installation and commissioning.

2. Mongolia 5500TPD gold mineral processing project

Mongolia gold mine mineral processing project

Ore properties:Gold mine raw ore grade 1.6g/t .

Xinhai Solution: Heap leaching, desorption and electrolysis process flow.

Initially, the customer of this project entrusted Xinhai Mining to design the dressing plant and gold smelting construction engineering design, involving technology, civil engineering, electricity, water supply and drainage, heating and other aspects. Xinhai Mining Mining Design Institute set up a special project team and handed over a complete plant design plan in only 3 months. The customer was impressed by Xinhai Mining's technical strength and service attitude, and then decided to cooperate with Xinhai Mining Develop deeper cooperation.

3. Laos 2000TPD gold mine cyanide mineral processing project

Laos gold mine cyanide mineral processing project

Ore properties:This project The raw ore contains organic carbon and inorganic carbon, and the graphite content is 2%. Gold is the only recoverable element in the ore of this project.

Xinhai solution: full mud cyanide carbon slurry (CIL) process.

With the increase of mining depth, the properties of the ore in this project have changed greatly. The original flotation process is no longer suitable for the recovery of valuable elements in the ore. Therefore, the customer of this project decided to The original mineral processing process will undergo technical transformation. Through multiple inspections and comparisons, Xinhai Mining's production technology and management have been recognized by customers, especially Xinhai Mining's unique "Mining Whole Industry Chain Service (EPC+M+O)" model. After completely solving the customer's previous problems, we immediately decided to cooperate with Xinhai Mining Equipment.

In the design process of the dressing plant, Xinhai Mining appropriately added new equipment and processes on the basis of the original flotation plant, making full use of the existing plant, equipment and foundation, and through scientific and reasonable design of the dressing plant. The design ensures that the entire process flow of the dressing plant is smooth, and the new and old equipment are operating normally, which not only achieves the expected recovery rate, but also saves investment costs. The final gold mine recovery rate is 87%-95%. The customer is very satisfied with the results of this transformation !

4. Indonesia 700TPD gold mineral processing project

Indonesia gold mine beneficiation project

Ore properties:Gold in the ore of this project is the only Recycled elements, grade 2.6g/t.

Xinhai plan: Crushing and washing - pool leaching and adsorption - desorption and electrolysis - activated carbon pickling and regeneration - smelting.

Initially, after the project customers learned about Xinhai Mining’s full industry chain services (EPC+M+O), they expressed great interest in this unique service model. Xinhai Mining's technical staff gave him a detailed introduction, and based on the experience of previous projects undertaken by Xinhai Mining in Indonesia, they promptly proposed a rough solution for the customer. The customer of this project said that he was deeply impressed by the professional strength displayed by Xinhai Mining Equipment. Subsequently, the customer of the project visited Xinhai Mining, and further learned about Xinhai Mining's mineral processing technology strength, which strengthened the customer's intention to choose Xinhai Mining. After multiple comparisons and considerations, the two parties successfully reached a cooperation. After final smelting treatment, gold ingots with a purity higher than 80% were obtained, with an actual recovery rate of 85%.

It is worthy of recognition that Xinhai Mining installation and commissioning personnel overcame many difficulties during the epidemic, ensured the smooth progress of project installation and commissioning while ensuring their own safety, and successfully withdrew funds during the epidemic, with high standards and The high-quality professional attitude deeply impressed the customers.

5. Guizhou 700TPD gold mine tailings dry discharge project

Guizhou Gold Mine Tailings Dry Discharge Project

Ore properties:The tailings are flotation tailings from the original gold ore flotation workshop.

Xinhai solution: Concentrator+Filter press dehydration process for gold tailings.

During the design, the tailings dry discharge workshop was closely connected with the original flotation workshop, and the topographic advantages of the industrial site were reasonably utilized for process layout. In addition, in view of the nature of the tailings of this project, Xinhai Mining specially used a new filter press, which greatly reduced the moisture content of the tailings.

6. Henan 650TPD gold mineral processing project

Henan Gold Mine Mineral Processing Project

Ore properties:The average raw ore grade of this project is 2g/ t or above, it is a kind of gold mine with volcanic rock properties, which is difficult to grind and select.

Xinhai Plan: Crushing-closed-circuit grinding-flotation (one coarse, three sweeps, four fines)-concentrate dehydration process.

The client of this project has tried to renovate the project twice, but the results were not satisfactory. Afterwards, the person in charge of the project found Xinhai Mining and entrusted Xinhai Mining Research Institute to conduct mineral processing tests for them. Xinhai Mining Research Institute is unique in gold ore beneficiation, especially in the experimental research of refractory ore beneficiation. It has valuable experience. Through repeated tests, it was finally decided to use crushing-closed-circuit grinding for the gold mine of this project. Flotation (first coarse, third sweep, fourth fine)-concentrate dehydration process flow. In addition, Xinhai Mining Design Institute redesigned the design and layout of the original dressing plant, taking into account both aesthetics and efficiency, becoming a typical benchmark for modern mineral dressing plants in Henan >.

7. Tanzania 500TPD gold mineral processing project

Tanzania Gold Mine Processing Project

This project is a complete equipment production line project undertaken by Xinhai Mining. The processing capacity is 500tpd. According to the detailed equipment technology provided by the customer According to the process parameters and drawings, Xinhai Mining customized various equipment and auxiliary materials in the crushing and screening – grinding and classification – pharmaceutical preparation – flotation – concentrate dehydration process, and improved the equipment according to the design and process requirements. .

8. Henan 3000TPD gold mineral processing project

Henan Gold Mine Mineral Processing Project

This project is a transformation project undertaken by Xinhai Mining Equipment. Xinhai Mining Equipment customized the project for the project The complete set of equipment in the gold mine flotation production line mainly includes ball mills, flotation machines, thickeners, stirring tanks and other equipment and accessories, and is based on the original beneficiation plant Improve the equipment according to the situation to make it comply with the process flow and factory selection basis.

As the global epidemic rages in 2020, Xinhai Mining actively adopts a variety of strategies to ensure the smooth progress of each processing plant project process as much as possible, and has won numerous orders for mining industry chain service projects. Many domestic projects have entered the During the installation and commissioning period, production is in sight, and some other projects are also under friendly negotiation. In addition, Xinhai Mining also provides various types of equipment for many projects.

24-hour service hotline 0086 15311826613

Message


WhatsApp

WhatsApp

ConsultConsult messageMessage E-mail

Email

xhshicuiping@dingtalk.com