This project is a Hunan 800TPD quartz sand mineral processing project undertaken by Xinhai Mining. The project includes mineral processing tests, mineral processing process design, mineral processing plant construction design, mineral processing plant complete sets of mineral processing equipment manufacturing and procurement, mineral processing plant on-site installation and commissioning, etc. It is a mining industry Full industry chain services (EPCM+O).
800TPD
Ball mill, hydrocyclone, dewatering screen, hindered settler, spiral chute
Grinding-gravity classification process plan
15311826613
Click to add WeChatGrinding and gravity separation process: The raw ore is transported to the ball mill for grinding through a belt, and the ground product flows into the pump box and is pumped in by the slurry pump After reaching the first-stage blocked settler, the underflow returns to the ball mill for regrinding, while the overflow flows to the second-stage blocked settler.
Re-selection and classification process: It is a two-stage hindered settler settling-cyclone classifying-dewatering screen dehydration process. After the slurry passes through the second-stage blocked settler, it flows into the pump box, and is pumped by the slurry pump to the hydrocyclone for classification. The overflow returns to the second-stage blocked settler, and the underflow flows to the dewatering screen for dehydration. The material on the screen is quartz sand. The concentrate is transported to the concentrate yard by a belt conveyor, and the screened products are returned to the pump box. The overflow of the second-stage blocked settler flows automatically to the sedimentation tank (which is the tailings). The clear water in the upper layer of the sedimentation tank flows automatically into the return pool and is transported to the system by the water pump as system water supply.
During the project operation, Xinhai Mining technical personnel actively put forward rational suggestions and adopted them according to changes in various indicators, and coordinated various cooperation between cooperative units. problems, so that the construction site work can proceed smoothly and ensure the stable progress of the entire plant selection project.
Waiting for updates!