Tibet 1500tpd lead-zinc mine tailings dry discharge project

Tibet 1500tpd lead-zinc mine tailings dry discharge project

The Tibet 1,500tpd lead-zinc mine project is a tailings dry discharge project undertaken by Xinhai Mining. The tailings processing capacity of this project is 1,500t/d, and the average tailings concentration is 28%. The tailings dry discharge process designed by Xinhai is a dehydration process of hydrocyclone + dewatering screen + filter press. The final tailings moisture content is less than 20%.

  • 【Processing scale】:

    1500tpd

  • 【Customized equipment】:

    Shrinking hydrocyclone group, dewatering screen, filter press, belt conveyor

  • 【Process flow】:

    The dehydration process of hydrocyclone + dewatering screen + filter press.

添加微信:15311826613

15311826613

Click to add WeChat
Get product price获取产品价格
WeChat ID has been copied, add friends, and get manufacturer quotations!

XINHAI-Tibet 1500tpd lead-zinc mine tailings dry discharge projectintroduce

Tailings dry discharge process flow

The flotation tailings are transported to the rubber pump box of the dry discharge workshop by gravity flow or pump, and are pumped into the concentrated hydrocyclone group, and the bottom flow of the cyclone is It flows automatically to the dehydration screen. The upper part of the dehydration screen is transported out of the workshop by a belt for storage, and the lower part of the screen is transported to the concentrator by a pump.

The overflow of the cyclone flows to the concentrator. After concentration, it is pumped into the filter press with the filter press feeding pump and pressed into a filter cake. It is transported out of the workshop with a belt and stored outside the workshop. The filter press filtrate The filtrate flows from the dewatering screen to the filtrate buffer tank, and then is transported to the concentrator by a pump. The overflow of the concentrator flows to the return tank. After clarification, it is transported back to the dressing plant by a return pump for use.

Tibet 1500tpd lead-zinc mine tailings dry discharge process


Project results

Tibet 1500tpd lead-zinc mine tailings dry discharge project

The concentration of the tailings after treatment is 80%, the water recovery rate is 92%, and the water content of the tailings after treatment is less than 20%.